CHAENG can provide technological solutions and complete production equipment for cement & ggbs & quicklime (active lime) production line. We use the new type, energy saving and environmental system, through which fuel consumption can be reduced 40%, output capacity increased 30%.

CHAENG (Great Wall Machinery Corporation) delivers reliable cement project execution for cement plants using advance cement machineries.

In 2009, we invested CNY 50 million to build the 600,000 t/a GGBFS plant demonstration base, main equipment GRMS 46.41 vertical mill.

In 2011, Tangshan Hongyan Company is specialized in producing concrete and GGBS powder, and owns two production lines.

For achieve energy saving,Guangdong company import CHAENG GRMS46.41 vertical slag mill,build 600,000t/a slag powder production line.

Weihui Cement Co., Ltd. launched the construction of 4500t / d cement production line, the CHAENG selection configured Φ4.5 × 66m rotary kiln and Φ3.4 × 6 + 3m coal mill two devices.

CHAENG provide the most leading and the largest size GRMR53.41 vertical raw mill with national energy conservation policy for supporting the Meng Electric 5000t / d cement production line.

The project is a national comprehensive utilization foundation demonstration,1 million industry wastes are reused in the plant.

Chongqing Jinjiang Cement Co., Ltd is a large scale cement enterprise that located in Tongliang. It totally takes 600 million CNY to build the new suspension preheater dry production line, the annual

The cement production line adopts the latest and the most advanced dry process production technology, reducing the consumption of raw material on the whole and improving the output.

The cement production line adopts the latest and the most advanced dry process production technology.

As an outstanding dry process production line, which adopts latest technology, reduces consumption and increases output as a whole.